Skip to content
Amana Finishes
Painting service

Exterior Painting in the GTA

Siding, trim, soffit and masonry repainting built around the short Ontario exterior season and the freeze-thaw cycle that follows it.

  • Free walkthrough
  • Fixed written quote
  • 1,000+ homes painted
Two-storey home exterior being repainted with fresh trim and siding
AF-33Two-storey home exterior being repainted with fresh trim and siding
The problem

An exterior repaint in Ontario has to survive roughly a hundred freeze-thaw cycles a year. Water gets behind a film, freezes, expands, and lifts the coating off the substrate from underneath. That is why almost every failed exterior in the GTA fails the same way, peeling in sheets on the south and west elevations, and around every window sill where water sits.

Included

  • Low-pressure wash of all painted elevations, with a mildewcide where organic growth is present
  • Minimum 48 hours of drying after washing before any coating goes on
  • Scraping and feather-sanding to a sound edge, no coating over a lifting film
  • Rot probing at sills, trim ends and soffit corners, with findings reported before we proceed
  • Bare-wood spot-priming with an exterior bonding primer within 24 hours of exposure

Not included

  • Structural carpentry or rot replacement beyond filler-scale, quoted separately once probed
  • Roofing, eavestrough replacement and window sealing beyond the paint-line perimeter
  • Lead-safe practices on pre-1980 exteriors, which require a certified abatement contractor
How it works

How we deliver it

  1. 01

    Elevation-by-elevation survey

    Each face of the house is assessed on its own. South and west elevations take the UV load and almost always need more prep than the north side, and they get priced accordingly rather than averaged.

  2. 02

    Wash, then wait

    Low-pressure wash with a mildewcide where needed. Then a genuine 48-hour dry. This is the step that gets cut when a crew is behind schedule, and it is the step that determines whether your paint is still on the wall in five years.

  3. 03

    Scrape and stabilise

    Everything loose comes off. Edges are feathered so the repair does not telegraph as a ridge under the finish. Rot gets probed at every sill and trim end and reported to you with photos.

  4. 04

    Prime and seal

    Bare substrate primed within a day of being exposed. Joints, end-grain and window perimeters caulked with an exterior-grade elastomeric that can move with the seasons.

Specification

Season window
Mid-April to late October in the GTA, weather dependent
Minimum temperature
10 °C and rising, including the overnight low
Substrates
Wood and fibre-cement siding, aluminium, stucco, brick, soffit and fascia
Wash-to-coat gap
48 hours minimum
Primer
Exterior bonding or alkyd stain-blocking, spot-applied to bare areas
Finish
2 coats 100% acrylic exterior
Expected service life
7–10 years on wood, 10–15 on properly prepared masonry

Questions

Full FAQ

When is the best time to paint a house exterior in Ontario?

Late May through mid-September is the reliable window. April and October are workable but risky, the constraint is the overnight low, not the afternoon high. Acrylic exterior paint needs sustained temperatures above about 10 °C to coalesce into a continuous film, and a warm day followed by a 4 °C night can leave you with a coating that never properly forms. Book in winter for a spring slot; the good crews fill up by March.

How long does exterior paint last in the GTA?

Seven to ten years on wood siding with sound prep, ten to fifteen on properly prepared brick or stucco. South and west elevations always go first because they take the UV and thermal load, it is normal to touch those two faces up once during the life of the overall job. Anything failing inside three years is a prep failure, not a product failure.

Can you paint brick?

Yes, and it is permanent, that is the part people are not always told. Painted brick cannot be reasonably returned to bare brick; stripping is expensive, rarely complete, and can damage the face of the masonry. It also changes how the wall breathes, so it has to be done with a vapour-permeable masonry coating rather than standard exterior acrylic. We will walk you through the trade-off honestly before you commit, because the decision is effectively irreversible.

Do you paint aluminium siding?

Yes. Chalked aluminium is one of the better repaint candidates in the GTA because the substrate itself does not rot. It needs a thorough wash to remove the oxidised chalk layer, a bonding primer, and an acrylic topcoat. Done correctly it looks like new siding for a fraction of replacement cost.

What happens if it rains mid-job?

We stop and cover. Rain inside the recoat window is the single most common cause of surfactant leaching, those brown streaks you see on freshly painted houses. We would rather stretch a job by two days than hand you a wall that streaks the first time the weather turns.

Book a free walkthrough

Get a fixed quote for exterior painting.

Free walkthrough, a fixed written quote, and no obligation to go ahead.

  • 1,000+ homes painted
  • Free walkthroughs
  • Fixed written quotes
  • Serving Toronto and the GTA

No obligation. We reply within one business day.